Children’s Playground (Train Series) · SS-012438
Price on request
SKU: SS-012438
Product Technical Specifications Seating Area: 1085 × 411 cm (427 x 162 in) Safety Area: 711 × 1385 cm (280 x 545 in) Slide Connection Height: 100 × 150 cm (39.4 x 59.1 in) Spare Parts: - 100 cm (39.4 in) Height Metal Climbing Element – 1 piece - Composite Staircase – 1 piece - Metal Staircase Guardrail – 1 piece - Polyethylene Tube Pass – 1 piece - Polyethylene Train Track Barrier – 7 pieces - Polyethylene Train Roof – 1 piece - 116 × 116 mm (4.6 x 4.6 in) Square Composite Platform – 2 pieces - 100 cm (39.4 in) Height Left‑Inclined Slide – 1 piece - 100 cm (39.4 in) Height Straight Slide – 1 piece - 100 cm (39.4 in) Height Capped Tower – 4 pieces - 100 cm (39.4 in) Height Tower – 4 pieces - Polyethylene Train Figure – 1 piece Polyethylene Products: Low‑density linear polyethylene (LLDPE) is a thermoplastic used in many applications. It is semi‑permeable, pliable, and highly durable, offering low cost and high resistance. Based on density and chemistry, it is offered in various grades. Mechanical properties depend on molecular weight, crystal structure, and branching. Common attributes include good resistance to outdoor conditions and moisture, flexibility, low mechanical strength, and excellent chemical resistance. Polyethylene is used for slides, stairs, guardrails, barriers, accessories, roofs, etc. For color stability, masterbatch pigments must have a light‑fastness rating of 6 or higher. Minimum wall thickness is 6 mm (0.2 in) for components subjected to pressure or friction, and 4 mm (0.2 in) for non‑load‑bearing barriers and shade structures. Thickness tolerance is ±5%. Carrier Construction: Steel tubes with a minimum outside diameter of 114 mm (4.5 in) and a 2 mm (0.1 in) wall thickness are cold‑formed to TS EN 10219‑2, TS‑6476, DIN 2394 standards, then welded by high‑frequency welding. Tubes are sandblasted and coated with a polyester‑based electrostatic powder paint. Electrostatic Powder Coating Process: All metal parts are first sandblasted to remove oil, dirt, and rust, creating a surface that improves paint adhesion. After sandblasting, a fine steel shot coating is applied to open pores for better paint retention. The components are then cleaned in a 70 °C, 5 % oil‑removal bath for 10 minutes, followed by a 50 °C, 1 % iron‑pickling bath for 15 minutes. After rinsing and drying, the parts are coated with a polyester‑based electrostatic powder and baked at 200‑220 °C for 20 minutes. Final curing is performed at 180‑200 °C for 20‑30 minutes, ensuring a uniform, corrosion‑free finish. All welds are fully coated to prevent rust.