Children’s Playground (Train Series) · SS-012430
Price on request
SKU: SS-012430
Spare Parts: Polyethylene train carriage – 1 piece; Polyethylene tube pass – 1 piece; Polyethylene train roof – 2 pieces (height 100 cm (39.4 in)); Polyethylene straight slide – 1 piece; Polyethylene train field barrier – 8 pieces; Composite stair – 1 piece; Metal stair railing – 1 piece (height 150 cm (59.1 in)); Polyethylene wavy slide – 1 piece (height 200 cm (78.7 in)); Polyethylene spiral slide – 1 piece (height 150 cm (59.1 in)); UFO climbing element – 1 piece; Metal climbing entrance – 1 piece; 116 × 116 mm (4.6 x 4.6 in) square composite platform – 4 pieces. Polyethylene products: Low‑density linear polyethylene (LLDPE) is a thermoplastic used in many applications. It is semi‑permeable, flexible, and highly durable, offering low cost and excellent resistance to chemicals, outdoor conditions, and moisture. The material’s density and chemical composition determine its classification, while molecular weight, crystallinity, and branching influence mechanical properties. Advantages include good outdoor and moisture resistance, flexibility, modest mechanical strength, and superior chemical resistance. Polyethylene is used to manufacture slides, stairs, railings, barriers, accessories, roofs, etc. To prevent color fading, masterbatch pigments must have a light‑fastness rating of 6 or higher. Component thickness must be at least 6 mm (0.2 in) for parts subjected to pressure or friction, and at least 4 mm (0.2 in) for barrier or shading items not exposed to pressure. Thickness tolerance is ±5 %. Carrier construction: Steel tubes with a minimum diameter of 114 mm (4.5 in) and wall thickness of at least 2 mm (0.1 in) are cold‑formed in accordance with TS EN 10219‑2, TS‑6476, DIN 2394, and welded by high‑frequency welding. Tubes are sandblasted and powder‑coated with a polyester‑based electrostatic powder paint. Electrostatic powder paint process: All metal parts are sandblasted to remove oil, dirt, and rust, creating a porous surface for better paint adhesion. Fine steel balls are sprayed with compressed air to open microscopic pores. After sandblasting, parts are coated with polyester‑based electrostatic paint and cured in a 200–220 °C oven for 20 minutes. Post‑coating, metal components undergo a degreasing bath at 70 °C for 10 minutes (5 % solution), followed by a 15‑minute dip in a 50 °C iron bath (1 % solution). After rinsing and drying, a final polyester‑based electrostatic powder coating is applied and baked at 180–200 °C for 20–30 minutes. Weld seams receive a single coat to prevent corrosion.