Children’s Playground (Ship Series) · SS-011820
Price on request
SKU: SS-011820
Technical Specification. Product Size: 740 × 500 × 560 mm (29.1 x 19.7 x 22 in). Age Range: 2–12 years. Safety Area: 102 m (4016 in)². Spare Parts: Polyethylene ship bow assembly – 2 pcs; Polyethylene ship – 4 pcs; Polyethylene play‑area barrier – 10 pcs; Metal climbing element – 1 pc; Metal climbing stair – 1 pc; 100 cm (39.4 in) straight slide – 1 pc; 200 cm (78.7 in) spiral tube slide – 1 pc; Shaded crossing bridge – 1 pc; Boat bridge crossing – 1 pc; 116 × 116 mm (4.6 x 4.6 in) square composite platform – 8 pcs; Composite stair – 2 pcs; Metal stair guard – 2 pcs; Polyethylene ship figure – 4 pcs; 100 cm (39.4 in) tower tube – 8 pcs; 200 cm (78.7 in) tower tube – 10 pcs. Polyethylene Products: Linear low‑density polyethylene (LLDPE) is a thermoplastic used in many applications. It is semi‑permeable, pliable, and highly durable, offering low cost and excellent resistance to chemicals and environmental conditions. Based on density and chemical properties, LLDPE is classified into several categories. Its mechanical properties depend on molecular weight, crystal structure, and branching type. Common traits include good resistance to weathering and moisture, flexibility, modest mechanical strength, and superior chemical resistance. Polyethylene is used for slides, stairs, railings, barriers, accessories, roofing, and more. To prevent color fading, masterbatch pigments with a lightfastness value of 6 or higher are required. Minimum wall thickness is 6 mm (0.2 in) for load‑bearing parts and 4 mm (0.2 in) for non‑load‑bearing barriers and shade structures. Dimensional tolerance is ±5 %. Carrier Construction: Steel tubes with a minimum outer diameter of 114 mm (4.5 in) and a minimum wall thickness of 2 mm (0.1 in), conforming to TS EN 10219‑2, TS‑6476, and DIN 2394, are cold‑formed and welded by high‑frequency welding. Tubes are sandblasted and coated with a polyester‑based electrostatic powder coating. Electrostatic Powder Coating Process: All metal components are sandblasted to remove oil, dirt, and rust, then pre‑treated with a fine‑ball abrasive spray to enhance paint adhesion. After coating with polyester‑based electrostatic powder, parts are cured in a 200 – 220 °C oven for 20 minutes. Subsequently, components undergo a 10‑minute 70 °C dip in a 5 % oil‑removal bath, followed by a 15‑minute 50 °C dip in a 1 % iron bath, rinsing, and drying. Finally, the electrostatic powder coating is cured at 180 – 200 °C for 20 – 30 minutes, ensuring a uniform, rust‑free finish; welds are painted in a single coat after welding.